On September 16, 2026, Guinea’s Prime Minister Ba Ourey met with a delegation from Chinese enterprises led by State Power Investment Corporation and China Aluminium. The delegation presented the plans for the Guinea Corridor Mining and Logistics project, which involves building around 160 kilometers of railway lines to connect the bauxite mines in Guinea to Cape Verga deep-sea port, a port capable of accommodating ships with a capacity of 200,000 tons. According to the discussions, the total investment required for this project is estimated to exceed $3 billion. Once completed, the project is expected to enable the annual export of up to 77 million tons of bauxite. The two sides exchanged views on the project’s structure, implementation methods, and future prospects; the Chinese enterprises stated that this project will create a new strategic route for exporting Guinea’s bauxite and improve the local transportation and logistics infrastructure.