According to the Yangquan Daily, during the National Day holiday, construction was in full swing at the integrated aluminum industry project located within the Xiyan Circular Economy Industrial Park in Yu County; the 394,000-ton aluminum electrolysis project (with an initial capacity of 294,000 tons per year) was being built at an accelerated pace.
The new electrolytic aluminum production project with an annual capacity of 394,000 tons in Shanxi Zhaofeng Aluminum & Electric New Materials (part of the integrated aluminum industry chain project in Xiyan Circular Economy Industrial Park, Yu County) is located in Xiyan Town, Yu County, Yangquan. It is carried out by Zhaofeng Aluminum & Electric New Materials, which is part of Huayang Group, and it constitutes a key provincial-level capacity replacement project in Shanxi Province.
It is understood that once the project reaches full production capacity, its annual output value will exceed 6.5 billion yuan. The associated deep-processing projects, including those for producing 600,000 tons of hot-rolled sheets and strips as well as 60,000 tons of battery foil, will help create a complete industrial chain that spans from bauxite to high-end aluminum products.
Industry experts suggest that once the project is operational, the supply of aluminum melt in Shanxi will increase; this aluminum melt will be used locally to supply high-end aluminum processing projects within the park, thereby reducing the need to export aluminum ingots. It will also increase the supply of high-quality aluminum materials required for the photovoltaic and new energy sectors, thus optimizing the structure of domestic aluminum product supply.