In the first half of 2026, India’s imports of bauxite reached 3.7 million tons, a 129.5% increase compared to 1.612 million tons in the first half of 2025, representing an increase of 2.088 million tons. Currently, India produces around 25 million tons of bauxite per year, with total bauxite reserves amounting to 4.958 billion tons; the country also produces about 9.5 million tons of alumina per year. Based on the industry standard that requires 2.5 tons of bauxite for every ton of alumina produced, the current alumina production translates to a demand for around 24 million tons of bauxite. In 2025, domestic production was around 25 million tons, which should be sufficient to meet the current alumina production needs, leaving a surplus of nearly 1 million tons. Yet imports continue to rise. According to studies, India’s bauxite production in the first quarter of 2026 was estimated at 7.398 million tons, while imports in the first half of that year amounted to 3.7 million tons. This upward trend in imports has persisted for several years: around 3.1 million tons in 2021, 3.8 million tons in 2022, 3.7 million tons in 2023, 4.1 million tons in 2024, and nearly 4.9 million tons in 2025. In the first half of 2026, imports increased by 400,000 tons compared to 3.3 million tons in the second half of 2025, representing a 12.1% increase on a quarterly basis, indicating that this surge in imports is not a one-time phenomenon.
India is advancing several domestic bauxite projects to enhance supply. The Odisha Mining Corporation (OMC) plans to increase the output from its Kodingamali bauxite mine from 3.6 million tons per year to 6 million tons per year. The National Aluminium Company is developing the Pottangi bauxite mine, which has reserves of around 111 million tons and a production capacity of 3.5 million tons per year; this mine will enable NALCO to expand its alumina production by an additional 1 million tons per year, bringing the total alumina production capacity to 3.1 million tons by the first half of 2027. Hindalco Industries has signed a memorandum of understanding with OMC to secure a long-term supply of bauxite for the expansion of its Aditya plant in Odisha; this expansion will add 850,000 tons per year to production, with commissioning expected in the 2027-28 fiscal year. Pioneer Aluminium Industries maintains a production capacity of 1.5 million tons per year, while United Company RUSAL is acquiring up to 50% of its shares in order to strengthen its alumina and raw material supply chains. Together, the Sijimali, Kodingamali, and Pottangi projects will add a total of 21.5 million tons per year to bauxite mining capacity.
If the Sijimali, Kodingamali, and Pottangi projects proceed as planned, India’s domestic bauxite production could rise to between 45 million and 50 million tons per year. Production of alumina is also expected to increase significantly. With the expansion of refining capacity, India’s production of metallurgical-grade alumina is projected to reach around 21.8 million to 23.8 million tons by 2036. At a conversion rate of 2.5 to 1 between bauxite and alumina, this will require approximately 54.5 million to 59.5 million tons of bauxite per year. Even if domestic bauxite production reaches 45 million to 50 million tons, India may still need to import ore. Based on these figures, the potential shortfall would be around 4.5 million to 14.5 million tons per year. Meanwhile, if the planned increases in capacity and improvements in operations go ahead as scheduled, India could experience a surplus of alumina of at least 500,000 to 3 million tons by 2036 under an optimistic scenario. The future of India’s bauxite market will ultimately depend on how quickly new mines, refining capacity, and an adequate supply of suitable ore can be brought online.