The ERG Group of Kazakhstan plans to invest nearly $1 billion in the expansion of the second phase of the Pavlodar aluminum electrolysis plant. Construction is expected to begin in 2027, with the plant coming online between 2028 and 2029. The new facility will be built within the existing plant site, and upon completion it will add an additional 400,000 tons per year of aluminum electrolysis capacity; the current plant’s annual production volume is 250,000 tons. Once this project is completed, the company’s ability to process alumina will increase significantly, allowing it to convert all its own alumina into high-quality aluminum ingots with a purity of over 99.7%. These products have already received certification from the London Metal Exchange (LME).